[codex] Link matching iplDate unit #170

Merged
coah80 merged 1 commits from agent/worker43-next-unit into main 2026-09-22 08:09:47 +00:00
coah80 commented 2026-09-22 08:09:01 +00:00 (Migrated from github.com)

What changed

Promote src/scene/calendar/iplDate.cpp from Equivalent to Matching in the 43U configuration. The object was already byte exact; this records its complete link status.

Validation

  • Objdiff: 2,868/2,868 code bytes, 356/356 data bytes, and 19/19 functions matched.
  • Unit completion: 2,868/2,868 code, 356/356 data, and 1/1 complete unit.
  • All owned sections matched: .bss, .ctors, .data, .rodata, .sdata, .sdata2, and .text.
  • pool_diff.py: POOL IDENTICAL up to 4 (mine=4 base=4).
  • Instruction comparison: 19/19 functions exact with zero differences.
  • git diff --check: passed.

The full 43U build reached compile, report generation, link, and DOL generation. Its final repository SHA1 check remains failing because the generated DOL is 7fea7cf61023453ba144acc6266011ffd90ed122, while the configured target is 26116613f624061ba99c8d1a299aaa6efa85670d.

Note

Set scene/calendar/iplDate.cpp matching status to Matching

Updates the calendar library section in configure.py to change scene/calendar/iplDate.cpp from Equivalent to Matching.

Macroscope summarized 6136a2e.

## What changed Promote `src/scene/calendar/iplDate.cpp` from `Equivalent` to `Matching` in the 43U configuration. The object was already byte exact; this records its complete link status. ## Validation - Objdiff: 2,868/2,868 code bytes, 356/356 data bytes, and 19/19 functions matched. - Unit completion: 2,868/2,868 code, 356/356 data, and 1/1 complete unit. - All owned sections matched: `.bss`, `.ctors`, `.data`, `.rodata`, `.sdata`, `.sdata2`, and `.text`. - `pool_diff.py`: `POOL IDENTICAL up to 4 (mine=4 base=4)`. - Instruction comparison: 19/19 functions exact with zero differences. - `git diff --check`: passed. The full 43U build reached compile, report generation, link, and DOL generation. Its final repository SHA1 check remains failing because the generated DOL is `7fea7cf61023453ba144acc6266011ffd90ed122`, while the configured target is `26116613f624061ba99c8d1a299aaa6efa85670d`. <!-- Macroscope's pull request summary starts here --> <!-- Macroscope will only edit the content between these invisible markers, and the markers themselves will not be visible in the GitHub rendered markdown. --> <!-- If you delete either of the start / end markers from your PR's description, Macroscope will append its summary at the bottom of the description. --> > [!NOTE] > ### Set `scene/calendar/iplDate.cpp` matching status to `Matching` > Updates the calendar library section in [configure.py](https://github.com/coah80/wii-ipl/pull/170/files#diff-4d5f3192809ec1b9add6b33007e0c50031ad9a0a2f3f55a481b506468824db2c) to change `scene/calendar/iplDate.cpp` from `Equivalent` to `Matching`. > > <!-- Macroscope's review summary starts here --> > > <sup><a href="https://app.macroscope.com">Macroscope</a> summarized 6136a2e.</sup> > <!-- Macroscope's review summary ends here --> > <!-- Macroscope's pull request summary ends here -->
Sign in to join this conversation.